OPERATING INSTRUCTIONS
30 Sep 13 4-3
DE-7200VFDCentrifuge
DANGER! USE EXTREME CAUTION WHEN OPERATING CENTRIFUGE WITH
PURGE SYSTEM BYPASSED. DANGEROUSLY HIGH VOLTAGE WILL BE
PRESENT IN CONTROL CABINET IF DOOR IS OPENED WHILE POWER IS
APPLIED.
To bypass the purge system, proceed as follows:
1. Be certain that control cabinet is in a non-hazardous environment; then shut down, lock out,
and tag out electric power to centrifuge.
2. Remove bolts securing electrical panel door at right side of cabinet, and open door.
3. Locate intrinsic barrier at upper right side of electrical panel, and install a jumper across
terminals 1 and 4 to disable the purge system (Figure 4-1).
4. Label jumper “Purge Bypass”.
5. To restore purge system operation, remove the “Purge Bypass” jumper, and close and
secure electrical panel door. Confirm proper operation of the purge system.
Figure 4-1. Purge System Bypass
INITIAL STARTUP
Perform the initial startup procedure when the centrifuge is being started for the first time following
installation or after the machine has been relocated.
1. Check that all tools, documents, and shipping brackets have been removed, and there are no
obstructions to operation.
2. Verify that all personnel are clear of equipment.
3. Confirm that all operators and maintenance personnel have read and understand all operating
and safety information in Section 2.
4. Verify that equipment has been installed properly, all shipping brackets have been removed,
and bearing pillow blocks have been tightened to specified torque per Section 3.
5. For explosion-proof cabinet, turn on compressed air to purge system.
Kommentare zu diesen Handbüchern