AOpen AOI-702U Spezifikationen Seite 27

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 165
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 26
FA Inspector (AOI) Scanner
27 | Page
FocalSpot, Inc. | www.FocalSpot.com
R
R
e
e
q
q
u
u
i
i
r
r
e
e
d
d
I
I
t
t
e
e
m
m
s
s
(
(
A
A
O
O
I
I
M
M
o
o
d
d
e
e
)
)
Before setting up a new board in AOI Mode; select a PCB assembly and obtain the CAD or XY (Pick-&-Place),
BOM and Assembly Drawing data for this board. See the table below for details.
#
Required Items Remarks
1 Two (2) populated PCBs
(Of the same board type and revision)
AOI inspection: One (1) bare board of the same PCB
can also be useful to verify thresholds are properly set.
2 CAD or XY (Pick-&-Place) data containing
the following minimum information:
Part Reference IDs (RefID.)
Part Numbers (P/N)
Part X Position (XPos)
Part Y Position (YPos)
Part Rotation (Rt’n)
Package Types (Package)
ASCII text, Excel or CSV format is preferred.
Industry standard CAD files can also be used: (i.e., Cadif,
Cam Cad, Circuit Cam, Fab Master, Gen Cad, Juki, My
Data, Panasonic, Proteus, Mirae, Yamaha, etc.)
3 Assembly Drawing (PDF) If Parts references IDs are not screened onto PCB, an
Assembly Drawing may be required to identify three (3)
component alignment points used to scale the XY data to
the scanned image of the PCB.
4 Bill of Materials
(ASCII (text), Excel™, CSV or RTF)
The BOM is useful to validate the accuracy of the
assembly IAW the specification; and provides additional
information that may not be present in pick-&-place data,
such as: package and part extension information.
Why CAD and BOM?: The first step in performing a First Article Inspection should always be to verify that all
manufacturing documentation (assembly data
4
) and (materials
5
) are correct and complete. Then, the First
Article Inspection can be performed to validate that the first assembly has been constructed in accordance with
the design specifications prior to releasing the line for full production. As a result of the First Article process a
test routine is automatically created which can then be used to perform ongoing quality inspection tasks.
4
Drawings, change and revision notes, part specifications, etc.
5
Parts, components, subassemblies, etc.
Seitenansicht 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32 ... 164 165

Kommentare zu diesen Handbüchern

Keine Kommentare